The Pro controller is able to run off most sources of 240V AC power from either a generator or shore power. The Pro controller can handle both solar and AC power at the same time but solar power will be prioritized. To add AC power, a 240V AC plug will need to wired using the provided Pro AC input connector and another plug end like a Nema L14-30. The controller uses 3 wire input in the form of hot1, hot2, and ground. Be sure to double check the ground and hot positions are correct. Here is our video showing how to make your own plug:
Here is a page from the Pro installation manual:
Comments
0 comments
Article is closed for comments.